FIMI 3D Well Relocation Construction

Posted Date: May 16, 2025
Jun 01, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W912DS25S0045 FIMI 3D Well Relocation Construction
Synopsis

The New York District of the U.S. Army Corps of Engineers (USACE) proposes to perform construction of the FIMI Contract 3D (Well & Pump House): The new well and pump house of FIMI Contract 3D will be located in the Village of Ocean Beach, Fire island, Town of Islip, Suffolk County, NY.  Work will include: a 1,000 gpm deep well turbine pump will be installed at the well and a wood-framed pumphouse will be constructed to shelter the pump discharge head, electric motor, flow meter, piping, valves, and electric switchgear. The pumphouse will sit on a reinforced concrete foundation and a concrete driveway will be installed. A manual transfer switch and receptacle for connection to an on-site generator will be provided. A discharge pipe will be constructed to deliver raw water from the proposed well to the existing treatment facility. After treatment, well water will be connected to the distribution piping.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Presolicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙