Fiber Optic Cable B230 to B9511

Posted Date: May 08, 2026
Jun 08, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
FA302226Q0009 Fiber Optic Cable B230 to B9511
Synopsis

Engineer, furnish, install and test (EFI&T) 12-strand single mode (SM) fiber optic cables (FOC) from Infrastructure Transfer Building (ITB) 230 to Building (B) 9511 at Columbus AFB, MS.

The Contractor shall install approximately 3,100 feet (maintenance loop included) of 12-strand SM FOC from ITB 230 to B9511.  Terminate 12 strand SM FOC in the new 12-port FODP in ITB 230, and outdoor FODP in B9511.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙