SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR25BA005 | EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL | |
Synopsis | ||
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR25BA005 | EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL | |
Synopsis | ||
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR25BA005 | EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL | |
Synopsis | ||
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR25BA005 | EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL | |
Synopsis | ||
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR25BA005 | EMERGENCY STREAMBANK STABILIZATION VERMILION COUNTY, IL | |
Synopsis | ||
The scope of the project includes a detailed survey of the area. A geotechnical investigation was conducted to confirm the soil materials and analyze the method of failure. The bank will be cleared of all vegetation. It is proposed to install a riprap ditch along the edge of the road and connect to the top of the riprap. The method of streambank restoration is to backfill the eroded area with filter stone and class I riprap. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |