Elevator Modernization Project

Posted Date: May 11, 2026
May 18, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
ISO219-26 Elevator Modernization Project
Synopsis

5.5.26 Amendment 05 - Changes and Time Extension

4.22.26 Amendment 04 - Adding FAR Clause, Question & Answers and Building Drawings

4.17.26 - Site Visit Sign-in Sheet

4.8.26 Amendment 03 - Adding Technical Specifications

4.6.26 Amendment 02 - Updated project site location

4.6.26 Amendment 01 - Updated Mandatory Site Visit Information

Central Office in Washington, DC has identified a need to procure for modernization of three (3) passenger elevators and one (1) freight elevator. Also as a requirement, the elevator motor room must have its own separate entrance. Therefore the contractor will close off the current entrance from the engineer's room and bulid an outsidedoor with stairs to comply with building codes.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FEDERAL PRISON INDUSTRIES, INC Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
ISO219-26 Elevator Modernization Project
Synopsis

4.6.26 Amendment 02 - Updated project site location

4.6.26 Amendment 01 - Updated Mandatory Site Visit Information

Central Office in Washington, DC has identified a need to procure for modernization of three (3) passenger elevators and one (1) freight elevator. Also as a requirement, the elevator motor room must have its own separate entrance. Therefore the contractor will close off the current entrance from the engineer's room and bulid an outsidedoor with stairs to comply with building codes.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FEDERAL PRISON INDUSTRIES, INC Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙