Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)

Posted Date: Dec 03, 2025
Dec 19, 2025
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
W911S226RA003 Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)
Synopsis

This is an A-E Synopsis in accordance with FAR 36.6. The Mission and Installation Contracting Command ? Fort Drum is procuring Architect?Engineer (A E) Design Services for the development of a new Lacquer Preparation Facility and Chemical Storage Tank Farm at Holston Army Ammunition Plant (HSAAP), Kingsport, TN. This procurement is conducted under the Brooks Architect?Engineer Act (40 U.S.C. Section 1102) and FAR Subpart 36.6, which require that A E contracts be negotiated on the basis of demonstrated competence and qualifications for the required professional services. The facility will support production of plastic bonded explosives (PBX) and is critical to expanding the Department of Defense?s energetic materials manufacturing capacity.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙