SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR24R0059 | Design Build Arlington Heights Army Reserve Campus - G6 IT Upgrade Project | |
Synopsis | ||
Design Build Arlington Heights Army Reserve Campus - G6 IT Upgrade Project .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR24R0059 | Design Build Arlington Heights Army Reserve Campus - G6 IT Upgrade Project | |
Synopsis | ||
Design Build Arlington Heights Army Reserve Campus - G6 IT Upgrade Project .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR24R0059 | Design Build Arlington Heights Army Reserve Campus - G6 IT Upgrade Project | |
Synopsis | ||
Design Build Arlington Heights Army Reserve Campus - G6 IT Upgrade Project .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912QR24R0059 | Design/Build of the Arlington Heights Army Reserve Center Telecommunications Infrastructure Repair by Replacement, Arlington Heights, IL | |
Synopsis | ||
DESCRIPTION: The U.S. Army Corps of Engineers (USACE), Louisville District intends to issue a Request for Proposal (RFP) W912QR24R0059 for the upgrade of existing facilities IT network infrastructure (200,000 SF) at the Arlington Heights United States Army Reserve Center (ARC) campus in Arlington Heights, Illinois. There are six (6) buildings on this site, two (2) of them will be options. Some rooms may need to be constructed in the facilities to support the IT requirements. The project will include design of the facilities to meet current specifications to meet current IT infrastructure requirements. Inside and outside plant upgrades .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |