| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z04724RPCNI0007 | Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) | |
| Synopsis | ||
|
This Requirement will consist of Infrastructure, Utilities Distribution and Resiliency for Rio |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | AWARD Notice | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z04724RPCNI0007 | Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) | |
| Synopsis | ||
|
Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z04724RPCNI0007 | Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) | |
| Synopsis | ||
|
Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 70Z04724RPCNI0007 | Design/Build Construction for San Juan Hurricane Rebuild Rio Bayamon at USCG Base San Juan, San Juan, PR (Phase 1-Reprocurement) | |
| Synopsis | ||
|
THIS DESIGN BUILD PROJECT IS POSTED EXCLUSIVELY FOR THOSE CONTRACTORS ON THE CURRENT DHS/USCG NATIONAL MULTIPLE AWARD CONSTRUCTION CONTRACT III (NMACC III – Pool 1). This project is for design-build with the intention to rebuild to resilient standards shore facilities at U.S. Coast Guard Sector San Juan required as a result of damages sustained during Hurricane Maria. Phase 1 will consist of Infrastructure, Utilities Distribution and Resiliency for Rio Bayamon Housing Sites. Work shall include new campus wide generator system and distribution. A new water storage tank with pump and for distribution is included. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| US COAST GUARD | Combined Synopsis/Solicitation | |