SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008524R2534 | DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE | |
Synopsis | ||
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008524R2534 | DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE | |
Synopsis | ||
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008524R2534 | DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE | |
Synopsis | ||
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008524R2534 | DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE | |
Synopsis | ||
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |
SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
N4008524R2534 | DESIGN-BID-BUILD (DBB), B14 NEW STAIR/LIFE SAFETY/POWER IMPROVEMENTS PORTSMOUTH NAVAL SHIPYARD (PNSY), KITTERY, MAINE | |
Synopsis | ||
This contract is for Design-Bid-Build (DBB) construction services for B14, New Stair/Life Safety/Power Improvements, Portsmouth Naval Shipyard (PNSY), Kittery, ME. The project will include a total interior renovation of the four-story 22,705 square foot historic Building 14. The building is in dire need of utility upgrade repairs and egress / fire life safety /accessibility compliance upgrades. The project will also address the need for exterior envelope repairs, structural upgrades and removal of lead paint and asbestos materials from the interior finishes. Site improvements include all paving, walks, and utility pads. Utility repairs include electrical, fire, water, sanitary services, connections, and .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE NAVY | Combined Synopsis/Solicitation |