| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912DQ26QA080 | Debris Boom Supply and Install at Harry S. Truman Lake Project | |
| Synopsis | ||
|
The solicitation is amended to provide revisions to the Purchase Description, CLIN Structure, provide a Projnet Plan Room key to access the Bathymetry survey information and extend the quote due date. Also, Contractor Questions Answered Part 2 are posted. Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912DQ26QA080 | Debris Boom Supply and Install at Harry S. Truman Lake Project | |
| Synopsis | ||
|
The solicitation is amended to provide revisions to the Purchase Description, CLIN Structure, provide a Projnet Plan Room key to access the Bathymetry survey information and extend the quote due date. Also, Contractor Questions Answered Part 2 are posted. Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912DQ26QA080 | Debris Boom Supply and Install at Harry S. Truman Lake Project | |
| Synopsis | ||
|
Contractor Questions/Government Answers are posted. The purpose of the debris boom is to prevent floating debris from impacting the dam's tainter gates, which is crucial for maintaining the full operational capacity of the spillway. The boom will also serve as a visual barrier to boaters. The Contractor shall provide all labor, materials, equipment, engineering, fabrication, delivery, and optional installation necessary to furnish a complete debris boom system at Harry S. Truman Dam. The approximately 2,000-foot boom shall be designed to intercept floating debris upstream of the spillway and withstand site-specific hydraulic, wind, wave, debris, and impact loading conditions. The debris .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| No Set aside used | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| W912DQ26QA080 | Debris Boom Supply and Install at Harry S. Truman Lake Project | |
| Synopsis | ||
|
Debris Boom Supply and Install at Harry S. Truman Lake Project .... Read More
|
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation | |