SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912PL25BA002 | Dana Point West Breakwater Repair Project | |
Synopsis | ||
Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone Period of Performance: The total contract performance period is Three Hundred and Eight (308) calendar days after |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |
SetAside Type | ||
8(a) Set-Aside (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912PL25BA002 | Dana Point West Breakwater Repair Project | |
Synopsis | ||
Complete repair of the west breakwater located at the Dana Point Harbor. The work consists of replacing displaced armor stone Period of Performance: The total contract performance period is Three Hundred and Eight (308) calendar days after |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |