Concrete materials

Posted Date: Aug 05, 2026
Aug 11, 2026
Awarded Date: No Awarded Date
SetAside Type
Small Business Set Aside - Total
Solicitation ID Solicitation Title Solicitation Office
W912HZ26R7067 Concrete materials
Synopsis

The Directorate of Public Works at the Engineer Research and Development Center (ERDC) in Vicksburg, MS has a requirement for concrete materials at Building 2026 to help reduce dust. All materials, excluding the concrete, shall be delivered at one time within 14 Calendar Days of Award. The concrete shall be delivered in 3 separate (39 yd, 58 yd, 84 yd for a total of 181 yd) non-consecutive deliveries after being scheduled by Tony King (The three concrete deliveries are approximate in size, could be in any order, and there could be several days, up to 2 weeks, between deliveries to allow prep for the concrete).

.... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙