SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA489725QC049 | Concrete Foundation Material (Concrete, Base Course, #4 Rock, Sand) | |
Synopsis | ||
Questions & Answers (Q&A) and soliciation requirement clarifications: 1. For the #4 Rock. This is not for "Crushed Concrete". Any industry standard #4 Rock or " #4 crushed rock", that is a Subbase aggregate material, meeting this minimum specification and the ASTM requirements is acceptable. 2. This requirement requires the delivery of poured/mixed concrete. For clarification, The concrete pump truck is being requested during the concrete placement for the footer and pedestal portion of the project. The primary reason is safety, keeping the concrete truck away from the ledge to prevent cave-in. As well as reduce splattering and shifting .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |