Combined Project-Billings Cellblock refresh, Bozeman Wall addition, Bozeman Freezer HVAC

Posted Date: Apr 23, 2026
May 07, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
47PD5526R0018 Combined Project-Billings Cellblock refresh, Bozeman Wall addition, Bozeman Freezer HVAC
Synopsis
  1.  Billings USMS - Cellblock Refresh
    1. Stainless Steel Restoration:
    2.  Remove scratches from stainless steel benches and walls in:
    3.   Contractor/USMS/GSA walk-through required to verify exact damage locations
    4.   Painting
  2.  Bozeman FSA - Office Build-Out
    1. Build new wall with metal studs
    2. Install door and frame to match existing (type, size, color)
    3. Extend wall to deck above
    4. Install matching baseboard on new wall
    5. Add electrical receptacles if required by code
    6. Repair/replace carpet .... Read More
Office Location Agency Name Solicitation Base Posting Type
PUBLIC BUILDINGS SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙