SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
1282B125R0020 | COLUMBINE OFFICE PAINTING | |
Synopsis | ||
PROJECT: COLUMBINE OFFICE PAINTING PROJECT: SAN JUAN NATIONAL FOREST, COLORADO AMENDMENT ONE - See the Attachment/Links section to view the following: Amendment 0001 (A0001 includes the questions and answers along with the site visit's Attendee's List); Attachment 1A (the updated Statment of Work dated 04.14.2025); and Attachment 2A (the updated Schedule of Items (SOI)). COLUMBINE OFFICE PAINTING PROJECT: SAN JUAN NATIONAL FOREST, COLORADO ********See the SOW, Attachment 1, for details on the SITE VISIT scheduled or April 8, 2025.********** The work in this contract consists of the general construction of .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FOREST SERVICE | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
1282B125R0020 | COLUMBINE OFFICE PAINTING | |
Synopsis | ||
COLUMBINE OFFICE PAINTING PROJECT: SAN JUAN NATIONAL FOREST, COLORADO ********See the SOW, Attachment 1, for details on the SITE VISIT scheduled or April 8, 2025.********** The work in this contract consists of the general construction of providing all the materials, labor, and equipment necessary to conduct surface repair, preparation, priming, and painting/staining of all previously painted or stained exterior surfaces at the Columbine District Ranger Site. In addition, all stair treads are to be replaced at the Bayfield Modular Office Building. Lastly, the columns holding the gabled overhand above the front deck of the Columbine District Ranger Office .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
FOREST SERVICE | Combined Synopsis/Solicitation |