CGC Mobile Bay - Barge Crane

Posted Date: Apr 04, 2025
Apr 10, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
70Z08525Q12303 CGC Mobile Bay - Barge Crane
Synopsis

STATEMENT OF WORK

CGC MOBILE BAY                                    OPFAC:  09-17503         LOCATION:  Sturgeon Bay, WI 

EQUIPMENT:  Barge Crane

COMPONENT AFFECTED:  Engineering Study to renew/design outdated obsolete/unrepairable components.

Drawing:  APPLETON MARINE_CRANE ASSEMBLY_AMD 852

MPC:  NA

POP: 01MAY2025-01June2025

Contractor must design Crane swing drive assembly to renew all obsolete and unrepairable components, restore system back in normal operation once test is completed. Contractor must ensure all connections, fittings, and equipment within the crane system are operating correctly as well.

Any discrepancies found shall be noted; and corrected only if no other cost is needed. If .... Read More

Office Location Agency Name Solicitation Base Posting Type
US COAST GUARD Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙