SetAside Type | ||
8(a) Set-Aside (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912EQ24B0006 | Castor River and Ditch 39 Clearing and Snagging | |
Synopsis | ||
The work consists of furnishing all plant, labor, and material for clearing and snagging according to the specifications and plans and any incidental related work. Phase 1 will occur within the channel to clear trees and vegetation that have grown up within the bottom of channel footprint or along the channel bench, as to not disturb trees along top bank, except for equipment ingress/egress. Clearing and snagging will be performed as needed in areas where debris is diverting channel flow. The work shall be located at the confluence of Ditch 39 and Ditch 1, continue upstream on Castor River to the upstream limits of the project, approximately as indicated. The exact location will be indicated on the contract drawings. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
8(a) Set-Aside (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912EQ24B0006 | Castor River and Ditch 39 Clearing and Snagging | |
Synopsis | ||
The work consists of furnishing all plant, labor, and material for clearing and snagging according to the specifications and plans and any incidental related work. Phase 1 will occur within the channel to clear trees and vegetation that have grown up within the bottom of channel footprint or along the channel bench, as to not disturb trees along top bank, except for equipment ingress/egress. Clearing and snagging will be performed as needed in areas where debris is diverting channel flow. The work shall be located at the confluence of Ditch 39 and Ditch 1, continue upstream on Castor River to the upstream limits of the project, approximately as indicated. The exact location will be indicated on the contract drawings. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
8(a) Set-Aside (FAR 19.8) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912EQ24B0006 | CASTOR & DITCH 39 CLEARING AND SNAGGING | |
Synopsis | ||
Title of Work: CASTOR & DITCH 39 CLEARING AND SNAGGING Project Description: The work consists of furnishing all plant, labor, and materials for clearing and snagging according to the specifications and plans, and any incidental related work. The work will occur within the channel to clear trees and vegetation that have grown up within the bottom of the channel footprint or along the channel bench as to not disturb trees along top bank, except for equipment ingress/egress. Clearing and snagging will be performed as needed in areas where debris is diverting channel flow. The work shall be located at .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |