Building 419 Repair Restrooms & Breakroom

Posted Date: Jun 09, 2025
Jun 20, 2025
Awarded Date: Jun 05, 2025
SetAside Type
8(a) Sole Source (FAR 19.8)
Solicitation ID Solicitation Title Solicitation Office
W912PP25Q0017 Building 419 Repair Restrooms & Breakroom
Synopsis

This action was awarded as an 8(a) Sole Source Set-Aside under the authority of section 8(a) of the Small Business Act.

The contractor shall furnish all parts, material, labor, equipment and supervision necessary to complete the work for Building 419 Repair Restrooms and Breakroom- 

  1. Demolition
    1. Contractor shall demo existing flooring and sawcut existing slab as indicated on the not for construction drawings.   
    2. Contractor shall remove existing doors, frames, and hardware as indicated on the not for construction drawings.
    3. Contractor shall remove existing walls, electrical and comm. as .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY AWARD Notice
An error has occurred. This application may no longer respond until reloaded. Reload 🗙