Bridge Maintenance Camp Geronimo and Webber Creek

Posted Date: Jul 05, 2024
Due Date: Jul 27, 2024
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1126403 Bridge Maintenance Camp Geronimo and Webber Creek
Synopsis
Bridge Maintenance Camp Geronimo and Webber Creek .... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1126403 Bridge Maintenance Camp Geronimo and Webber Creek
Synopsis
  1. The USDA Forest Service. Payson Ranger District of Tonto National Forest, located in Gila County, Arizona has a requirement to address bridge maintenance needs on the Webber Creek and Camp Geronimo bridges. 

    The purpose of this project is to address bridge maintenance needs on the Webber Creek and Camp Geronimo bridges. The Webber Creek Bridge is a two-lane, single span, reinforced concrete bridge built in 2011. The Camp Geronimo Bridge is a single lane, single span, longitudinal glulam wood bridge built in 1955.  Both bridges reside within a forest restoration initiative area; therefore, the maintenance on these bridges is priority to assist broader agency goals.

    The Contractor shall provide all labor, materials, equipment, and tools, including incidentals, necessary for the bridge maintenance work items and traffic control required within this project.

.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙