SetAside Type | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W911WN25BA011 | Berlin Lake Sewer Treatment Plant Replacement | |
Synopsis | ||
Berlin Lake Sewer Treatment Plant ReplacementBerlin Lake, Berlin Center, PennsylvaniaThe U.S. Army Corps of Engineers (USACE), Pittsburgh District, is carrying out a Project to replace the existing Wastewater Treatment Facility (WWTF) at the location referenced above. Work is to be performed entirely on Government property, and the WWTP services USACE campgrounds and two field offices. The campground is open annually from mid-May to mid-September, while the two USACE field offices are open year-round. The Government currently operates the existing 30,000 gallon per day (gpd) WWTF year-round and will need continuous access and utility services during the Project. .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |