| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 12363N25Q4227 | Beaver Lake Dam Rehabilitation at Mark Twain National Forest | |
| Synopsis | ||
|
The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FOREST SERVICE | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 12363N25Q4227 | Beaver Lake Dam Rehabilitation at Mark Twain National Forest | |
| Synopsis | ||
|
The existing piping and control structure at Beaver Lake have failed resulting in the water surface elevation dropping almost 7-ft. Existing corrugated metal piping will be replaced with reinforced concrete piping. New filter drain, plunge pool, and control structure will be constructed. A modular retaining wall will also be constructed for access to the control structure. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| FOREST SERVICE | Combined Synopsis/Solicitation | |