BBVC Lakefront Trail and Outhouse Replacement

Posted Date: Apr 20, 2026
Apr 23, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240BJ26Q0004 BBVC Lakefront Trail and Outhouse Replacement
Synopsis

Amendment 1 (posted 4/20/2026): The purpose of this amendment is to make the following changes:

1. Disregard the custom sheltered entrances on sheet G-02 of the plans.

2. The quantity for item 2 subitem 55202-B2 has been increased to 2300.

3. The quantity for item 3 subitem 55202-O1 has been increased to 450.

4. There will not be a charge for on-site borrow.

5. The due date for quotes is extended to 4/23/2026 at 1700 (5 pm) Alaska time.

Statement of Requirement

This project involves the removal of an existing .... Read More

Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240BJ26Q0004 BBVC Lakefront Trail and Outhouse Replacement
Synopsis

Statement of Requirement

This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.

  1. Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
  2. Option item: Construction of a trail connecting the beach access near the building to the parking lot.
.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙