BBVC Lakefront Trail and Outhouse Replacement

Posted Date: Mar 03, 2026
Apr 21, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
1240BJ26Q0004 BBVC Lakefront Trail and Outhouse Replacement
Synopsis

Statement of Requirement

This project involves the removal of an existing concrete trail along the Portage Lake lakefront, and construction of a new trail that connects the existing Trail of Blue Ice to the Begich Boggs Visitor Center (BBVC). Additionally, two (2) existing outhouses will be decommissioned, and one (1) new double vault outhouse will be built in a new location.

  1. Option item: Work consists of constructing a scenic outlook platform with interpretive panels by the lakefront.
  2. Option item: Construction of a trail connecting the beach access near the building to the parking lot.
.... Read More
Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙