Backflow, valves and chiller replacements

Posted Date: Sep 16, 2025
Sep 16, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
15A00025Q00000111 Backflow, valves and chiller replacements
Synopsis

The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services:

  1. Backflow Preventors
    • Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP
    • Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP
    • Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP
  2. Main Gate Valves
    • Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the .... Read More
Office Location Agency Name Solicitation Base Posting Type
ATF ACQUISITION AND PROPERTY MGMT DIV Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙