SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA302225R0002 | B348 CDC Chiller | |
Synopsis | ||
Amendment 01: RFI answers are posted in the SAM.gov attachments. The purpose of this amendment is to: ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- The Contractor must provide all plant, labor, equipment, transportation, and tools required to replace, modify, and upgrade mechanical equipment of B348. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, except for the boiler and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA302225R0002 | B348 CDC Chiller | |
Synopsis | ||
The Contractor must provide all plant, labor, equipment, transportation, and tools required to replace, modify, and upgrade mechanical equipment of B348. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. The work required in this project includes, but is not limited to, replacement of the chiller, air handler, piping, insulation, pumps, and related electrical components. A full recommissioning and testing, adjusting, .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
FA302225R0002 | B348 CDC Chiller | |
Synopsis | ||
The Contractor must provide all plant, labor, equipment, transportation, and tools required to replace, modify, and upgrade mechanical equipment of B348. The intent of this project is to replace all mechanical and plumbing equipment in the mechanical room/yard, except for the boiler and water heater. Perform all work according to this Statement of Work (SOW), the Concept Design Drawings, and all related AF requirements and other codes and references. The work required in this project includes, but is not limited to, replacement of the chiller, air handler, piping, insulation, pumps, and related electrical components. A full recommissioning and testing, adjusting, .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation |