B268 Replace STUS Backup Generator

Posted Date: Aug 24, 2026
Sep 03, 2026
Awarded Date: No Awarded Date
SetAside Type
Small Business Set Aside - Total
Solicitation ID Solicitation Title Solicitation Office
FA302226R00023 B268 Replace STUS Backup Generator
Synopsis

Amendment 0001: The purpose of this amendment is to: 1. Attach "Appendix A - Cost Breakdown" to Section J. 2. All other terms and conditions remain unchanged.

Notice 0002: Sign in Sheet and RFI answeres have been posted. 

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

Notice 0001: The description below was edited to correctly reflect this requirement.

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
FA302226R00023 B268 Replace STUS Backup Generator
Synopsis

Notice 0001: The description below was edited to correctly reflect this requirement.

-------------------------------------------------------------------------------------------------------------------------------------------------------------------------------

NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.

Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full replacement of .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
FA302226R00023 B268 Replace STUS Backup Generator
Synopsis

NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically.

Description: The primary objective of this project is to replace the elevator car, mechanical pump and control systems, and hoist-way doors. The intent is to reuse existing hydraulic jack system in the elevator shaft. .... Read More

Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE AIR FORCE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙