| SetAside Type | ||
| Small Business Set Aside - Total | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA302226R00023 | B268 Replace STUS Backup Generator | |
| Synopsis | ||
|
Amendment 0001: The purpose of this amendment is to: 1. Attach "Appendix A - Cost Breakdown" to Section J. 2. All other terms and conditions remain unchanged. Notice 0002: Sign in Sheet and RFI answeres have been posted. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Notice 0001: The description below was edited to correctly reflect this requirement. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA302226R00023 | B268 Replace STUS Backup Generator | |
| Synopsis | ||
|
Notice 0001: The description below was edited to correctly reflect this requirement. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The Contractor must provide all plant, labor, equipment, transportation, and tools required to complete a full replacement of .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |
| SetAside Type | ||
| Total Small Business Set-Aside (FAR 19.5) | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA302226R00023 | B268 Replace STUS Backup Generator | |
| Synopsis | ||
|
NOTE: Contractors/Offerors must complete CUI Training Slides; sign and return the "MFR Contractor CUI Training Acknowledgment for Solicitations" attachment to gain access to drawings and other associated CUI documentation. Once the POC has received your signed MFR, please request access to the locked documents through SAM.gov. Your MFR will be reviewed and access to the lock SAM.gov documents will be granted accordingly. Proposals will be submitted electronically. Description: The primary objective of this project is to replace the elevator car, mechanical pump and control systems, and hoist-way doors. The intent is to reuse existing hydraulic jack system in the elevator shaft. .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |