| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| FA462626Q0008 | B1825 LIGHTNING PROTECTION SYSTEM | |
| Synopsis | ||
|
This requirement is to provide all items, articles, materials, operations, or methods listed, mentioned or scheduled on the drawings and/or as specified herein, including all labor, materials, equipment, and incidentals necessary and required for completion of a lightning protection system (LPS) upgrade and inspection. The LPS system cables shall be up sized to AWG 4/0 (approximately ½”) copper to bring the system up to code, and a small quantity of frayed cable will be replaced. The LPS inspection shall be compliant with the most current edition of NFPA 780. The Contractor shall provide and deliver to the United States Air .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| DEPARTMENT OF THE AIR FORCE | Combined Synopsis/Solicitation | |