Axtel Lower Water Ramp & Road Construction (Rough River Lake)

Posted Date: Dec 30, 2022
Due Date: Jan 13, 2023
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
W912QR23Q0017 Axtel Lower Water Ramp & Road Construction (Rough River Lake)
Synopsis
Axtel Lower Water Ramp & Road Construction (Rough River Lake) .... Read More
Office Location Agency Name Solicitation Base Posting Type
DEPARTMENT OF THE ARMY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙