SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912WJ24Q0107 | Aquatic Herbice Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH | |
Synopsis | ||
Aquatic Herbice Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH .... Read More
|
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | AWARD Notice |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912WJ24Q0107 | Aquatic Herbice Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH | |
Synopsis | ||
THE WORK CONSISTS OF: Furnish all materials, equipment, and labor to apply a systematic aquatic herbicide to control variable milfoil at the Hopkinton-Everett Lakes Flood Control Project. The primary treatment location(s) consist of portions of Elm Brook Pool and Drew Lake Canal in Hopkinton, NH (approximately 50 acres). This procurement is set-aside for small business vendors. The applicable NAICS code is 541990 with a Small Business Size Standard of $19.5 Million. ALL VENDORS MUST HAVE AN ACTIVE REGISTRATION IN SAM.GOV AT THE TIME OF SUBMISSION IN ORDER TO BE CONSIDERED. ANY VENDOR THAT DOES NOT HAVE AN ACTIVE SAM.GOV REGISTRATION WILL BE REJECTED AS NON RESPONSIVE. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912WJ24Q0107 | Aquatic Herbice Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH | |
Synopsis | ||
The U.S. Army Corps of Engineers – New England District is issuing a Pre-Solicitation Notice for Aquatic Herbicide Treatment for the Control of Milfoil, Hopkinton Lake, Hopkinton, NH THE WORK CONSISTS OF: Furnish all materials, equipment, and labor to apply a systematic aquatic herbicide to control variable milfoil at the Hopkinton-Everett Lakes Flood Control Project. The primary treatment location(s) consist of portions of Elm Brook Pool and Drew Lake Canal in Hopkinton, NH (approximately 50 acres). This is not a request for quotes at this time. The solicitation requirements and contract documents, to include instructions for submission, and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Presolicitation |