| SetAside Type | ||
| Solicitation ID | Solicitation Title | Solicitation Office |
| 4-B157-P-00121-00 | APS-U 20ID-E Stairs_19ID/20ID Crossover | |
| Synopsis | ||
|
There are 2 separate SOW's to design and install stairs inside the APS ring per the suggested specs. SOW-1: ISN (19-ID) and HEXM (20-ID) Beamline Crossover The contractor shall provide all labor, materials, tools, equipment, supervision and all necessary appurtenances to provide fabrication, testing, acceptance, delivery, and installation of beamline crossover at ISN (19-ID) and HEXM (20-ID) beamlines in the Advanced Photon Source experiment hall corridor. SOW-2: LBB-HEXM Stairs (20-ID-E) The contractor shall provide all labor, materials, tools, equipment, supervision and all necessary appurtenances to provide fabrication, testing, acceptance, delivery, and installation of stairs just upstream .... Read More |
||
| Office Location | Agency Name | Solicitation Base Posting Type |
| ENERGY, DEPARTMENT OF | Combined Synopsis/Solicitation | |