APS-U 20ID-E Stairs_19ID/20ID Crossover

Posted Date: Mar 06, 2024
Due Date: Apr 11, 2024
Awarded Date: No Awarded Date
SetAside Type
Solicitation ID Solicitation Title Solicitation Office
4-B157-P-00121-00 APS-U 20ID-E Stairs_19ID/20ID Crossover
Synopsis

There are 2 separate SOW's to design and install stairs inside the APS ring per the suggested specs.

SOW-1: ISN (19-ID) and HEXM (20-ID) Beamline Crossover

The contractor shall provide all labor, materials, tools, equipment, supervision and all necessary appurtenances to provide fabrication, testing, acceptance, delivery, and installation of beamline crossover at ISN (19-ID) and HEXM (20-ID) beamlines in the Advanced Photon Source experiment hall corridor.

SOW-2: LBB-HEXM Stairs (20-ID-E)

The contractor shall provide all labor, materials, tools, equipment, supervision and all necessary appurtenances to provide fabrication, testing, acceptance, delivery, and installation of stairs just upstream .... Read More

Office Location Agency Name Solicitation Base Posting Type
ENERGY, DEPARTMENT OF Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙