ACP LTR Bridge Trail Crossing Fence Replacement

Posted Date: Jun 02, 2025
Jun 18, 2025
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
12445525B0010 ACP LTR Bridge Trail Crossing Fence Replacement
Synopsis

Project Name: ACP LTR Bridge Trail Crossing Fence Replacement

Magnitude: In accordance with FAR 36.204 the magnitude of this project is: Between $100,000 and $250,000.

Scope of Work: Remove and replace 11,000 linear feet of fence line at the SRS Tail Bridge Crossing area. Work includes providing all labor, material, tools, equipment, Personal Protective Equipment (PPE), supervision, mobilization, and other incidentals necessary to construct and clear the boundary fence. Clearing limits are 3 feet from both sides of the fence line (total 6 feet).

Period of Performance: 90 days after receiving the notice to proceed.

Site Visit: A site visit is .... Read More

Office Location Agency Name Solicitation Base Posting Type
FOREST SERVICE Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙