43--A3 WELL BOOSTER

Posted Date: May 08, 2026
May 29, 2026
Awarded Date: No Awarded Date
SetAside Type
Total Small Business Set-Aside (FAR 19.5)
Solicitation ID Solicitation Title Solicitation Office
140G0126Q0149 43--A3 WELL BOOSTER
Synopsis
The USGS Columbia Environmental Research Center has a requirement for the removal and replacing the existing centrifugal pump and install an appropriately sized VFD (Variable Frequency Drive) and support controls. The removal of the existing centrifugal pump and installing the appropriately sized VFD includes, but not limited to the following:

- All circuits shall be installed to the existing Local and National Electrical Code Standard.

- Remove the current pump and replace with two (2) redundant inverter- duty centrifugal pumps that meet current needs and support future growth.
- Remove the current motor starter and replace with a properly sized VFD and .... Read More
Office Location Agency Name Solicitation Base Posting Type
US GEOLOGICAL SURVEY Combined Synopsis/Solicitation
An error has occurred. This application may no longer respond until reloaded. Reload 🗙