Solicitation ID | Solicitation Title | Solicitation Office |
W912BU25QA001 | 3438 McMurdo Prefabricated Bridges | |
Synopsis | ||
***7 March 2025: Amendement 0001: Extended quote due date until Friday, 14 March 2025.*** ***7 March 2025: RFIs Answered: Question 2: TL-3 guide rail system: Acceptability of erection and final assembly expectations: This particular rail system requires tensioning to be effective, and will not have complete integrity until fully assembled with the ends of the bridge in-place; is this understood by your team? Answer 2: Performance requirements stated in the Statement of Work (SOW) for the bridge, while functioning as a bridge, will not be enforced until the bridge is fully installed and placed into service. .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |
SetAside Type | ||
Total Small Business Set-Aside (FAR 19.5) | ||
Solicitation ID | Solicitation Title | Solicitation Office |
W912BU25QA001 | 3438 McMurdo Prefabricated Bridges | |
Synopsis | ||
***25 February 2025: RFI Answered: Question 1: Do you have any plans or a geotechnical report for the bridge? The SOW sounds like just a material quote, do you also need superstructure and abutment design as well? Answer 1: The Government is not providing any geotechnical reports at this time. As outlined in the SOW, the Government will design the necessary foundations/abutments for the bridge to be installed on. The bridge supplier is responsible for providing engineering information and coordinating with the Government engineering team with regards to foundations and installation. The Government will be responsible for erecting the bridge components and .... Read More |
||
Office Location | Agency Name | Solicitation Base Posting Type |
DEPARTMENT OF THE ARMY | Combined Synopsis/Solicitation |